Venue Survey and Load-in Check the route equipment will actually travel and the routes visitors will use. Mark questions for the facilities and technical teams on the plan and assign a person and deadline to resolve each one. Author: EVENTODIT Editorial Team Published: 2026.10.09 Updated: 2026-10-27T09:55:37Z Original URL: https://eventodit.com/en/stories/venue-site-survey-load-in.html Practical summary Key decision: Walk from unloading to installation and assign a person and reply deadline to every unresolved condition. Responsible roles / intended readers: Survey, production and facilities teams Record / next task: Load-in, power, fixing and sightline survey sheet, plus outstanding-conditions register Basis of information: Practical decision guide Editorial review: 2026-10-20 Part 1. Planning and Procurement Lead **"Assumptions are the greatest risk. Align all suppliers around documented conditions."** - Separate audience and system routes completely: Start with the venue plan and secure audience entrances and emergency evacuation routes as the first priority. Then overlay the system layout so camera control positions, cable runs and other equipment do not intrude on audience routes. - Avoid verbal agreements and set reply deadlines: Do not estimate dimensions by eye or rely on a venue representative's verbal assurance that something "seems possible." Formally ask the facilities team about unconfirmed items, set a clear reply deadline, and document the response. - Manage versions of the common conditions sheet: Share changes made after the survey and replies from the facilities team with all suppliers through the same conditions sheet. This prevents suppliers from submitting quotations based on different assumptions. Practical workflow · Role handover Resolve questions left by the survey Roles: Planning team · Facilities / technical team 1. [Planning team] Log unknowns Record item, photo reference and drawing location 2. [Planning team] Assign owner and deadline Request a reply from facilities or technical personnel 3. [Facilities / technical team] Confirm the condition Update the common condition sheet and version 4. [Planning team] Share with suppliers Check quotation and installation impacts and change history Part 2. Facilities and Technical Director **"A visible socket is not the end of the power plan. Obtain formal approval for capacity and structural limits."** - Inspect power capacity and wiring plans: Do not assume power is sufficient simply because the venue has wall sockets. Calculate the power consumption of all equipment to be brought in, review the available supply capacity and permitted additional wiring work for each system with the venue, and obtain approval. - Obtain formal approval for rigging loads and structures: If speakers, lighting or truss must be suspended from a ceiling or wall, ask the venue for official load data and the approval procedure confirming that the structure can bear the weight. - Check environmental factors on the event timeline: Along with sightline checks, including seats obstructed by columns, record environmental factors such as daylight and external noise at the actual event time in the technical inspection report. Part 3. Floor Operations and Logistics Lead **"A site survey really starts at the loading bay, not the stage."** - Simulate load-in and establish the basis for labor costs: Carefully measure the loading area where freight vehicles will park, the dimensions of available freight elevators, and the permitted load-in time limits. These directly affect suppliers' calculations of additional labor costs. - Confirm temporary staging and floor protection rules: Check whether protective coverings are required to protect marble or carpeted floors when heavy carts move across them, and whether temporary space is available to stage equipment, to prevent logistics bottlenecks. - Share a location-referenced site report: Instead of sending different photographs to different suppliers, combine site photographs matched to numbered locations on the plan into a single report so all staff understand the space in the same way. Practical workflow · Sequence Follow the route equipment will travel 1. Vehicle stop and unloading Check permitted location and access times 2. Temporary staging Check shared areas and floor protection 3. Access door and lift Check dimensions, reservations and work restrictions 4. Final installation position Compare the entire route with venue records Operational workflow Practical workflow · Converging inputs Merge survey findings into one shared conditions register Inputs: - Audience and emergency routes / Planning Secure access and emergency escape routes first; check conflicts with cameras, control positions and cables. - Facility and technical conditions / Facilities Record power demand, permitted capacity, cabling, rigging loads, approval scope, and light and noise at the event time. - Unloading and load-in conditions / Logistics Measure vehicle and lift clearances, thresholds, access times, staging and floor-protection requirements; link photos to numbered plan locations. Combine into one shared record 1. Compile unresolved conditions as questions Do not treat estimates or verbal answers as confirmed conditions. Assign a person to verify each item and a response deadline. 2. Record formal replies and approval scope Distinguish confirmed and unresolved items; align revision numbers and change logs across the shared register, plans and photos. 3. Send the same revision to every supplier Give all suppliers identical load-in and installation conditions for their quotations and work plans. Note: The three inputs represent findings from each discipline. Secure emergency routes before positioning systems. Do not mark unanswered or unapproved items as complete. **Final check before use:** Before staff and systems from each team are brought into the venue, compile the checks identified in this manual and conduct a final cross-check. Application conditions Share common drawings and changes with suppliers. Secure emergency and accessible routes before adjusting installation with technical and facilities personnel. Unconfirmed information Socket locations or verbal assurances are not power or load approvals. Capacity, wiring and permitted fixings require documentary confirmation from the relevant owner. Sources AVIXA — Conditions to check during a site survey. https://www.avixa.org/explore/articles/how-to-conduct-a-proper-site-survey-and-avoid-problems-later