EVENTODIT.
EDITABLE WORK DOCUMENT

Risk, protective action and response responsibility log

Link location-specific risks, existing controls, unresolved checks and reporting, protection and decision roles.

WHAT THIS TEMPLATE HELPS YOU PREPARE

A traceable record from risk identification through action, recheck and handover

File formats
English XLSX · CSV (UTF-8)
Version
2.0
Editorial review
31 Oct 2026
Use this for
Use with qualified leads before setup, public operations, exit and load-out, and after site changes.

When to use it

Use with qualified leads before setup, public operations, exit and load-out, and after site changes.

Do not invent risk scores or safety approvals. For immediate danger, protective action under the established emergency procedure takes priority over waiting for a reply.

Start with the guide: Identify event hazards and assign responsibilities for stopping and evacuation

Fill in the template step by step

When to use it

When reviewing the site and work plans, or after areas, timings or suppliers change.

What to have ready

  • Current layout, schedule and supplier work plans
  • Venue emergency plan and qualified-lead contact routes
  • Existing checks, actions and change requests
  1. Record where, when and whom a risk affects, with evidence.

  2. Ask the relevant lead to verify current controls and remaining risks.

  3. Record additional actions and distinguish reporting, protective and decision roles.

  4. Log the recheck result and time after action and hand unresolved items to the next responsible person.

Worked example

Fictional example, not an actual event or supplier record

Eight columns · scroll horizontally to view the complete worked example.

Risk, protective action and response responsibility log — fictional worked example
Risk ID, area and stage/timeAffected people and evidenceCurrent control and verified statusRemaining risk and specialist checkAdditional action, owner and deadlineDiscovery, reporting, protection and contact routeStop, evacuation or restart authority and planRecheck result, time and handover
HZ-01 / Loading gate G1 / 11-20 08:00–10:00Vehicles meet workers and pedestrians / layout L1, photo P01Pedestrian route marked on proposal only; physical separation unverifiedPedestrians could enter moving-vehicle area / venue and logistics review neededLogistics L01 and venue V01 confirm separation by 11-19 16:00Observer O01 reports to C01 / protect access under the site plan if danger arisesV01 and L01 authority to stop/restart requires confirmation in plan SP1Open / 11-19 14:00 / unresolved item handed to operations P01
HZ-02 / Exit E2 / planned finish 20:00Audience and people needing assistance / narrowing stair photo P02Steward location and lighting test completed LOG2 18:00Simultaneous exit flow and adjacent-event interference unknownO02 and venue V01 recheck route by 19:00O02 reports to C01 / follow approved exit plan EP2V01 and safety S01 decide exit changes or restart / consult EP2Open conditions / S01 site check planned at 19:00
HZ-03 / Temporary power P3 / before rehearsalTechnical workers and audience / cable-route change CH3Electrical lead E01 received drawing EV2; review underwayFitness for use unconfirmed / not decided by the log keeperE01 returns review scope and findings by 11-19 17:00Discoverer reports to C01 / immediate danger follows site emergency planPower connection/disconnection follows E01 and venue plan, not planner discretionAwaiting specialist reply / P01 tracks deadline

Blank template preview

This preview shows a few rows. The downloaded file contains 24 prepared rows.

Eight columns · scroll horizontally to view the complete blank worksheet.

Risk, protective action and response responsibility log — blank worksheet
Risk ID, area and stage/timeAffected people and evidenceCurrent control and verified statusRemaining risk and specialist checkAdditional action, owner and deadlineDiscovery, reporting, protection and contact routeStop, evacuation or restart authority and planRecheck result, time and handover
————————
————————
————————

Check your completed template

  • Existing and additional controls show their actual verification status.
  • Reporting, immediate protection and stop/restart roles and contacts are clear.
  • Every incomplete action has an owner, deadline and recheck plan.

What to pass to the next person

The safety lead sends control evidence and open items to operations, venue and supplier leads. The next shift receives the applicable plan version and contacts.

Check before using this template

This log does not replace a required risk assessment, emergency plan or specialist approval. Confirm alarm, stop, evacuation and restart conditions with the site plan, authorities and qualified leads.

Sources used to develop this template

EVENTODIT created this template using the working methods described in the public sources below. It is not an official form and has not been reviewed or approved by those organisations.