EVENTODIT.
EDITABLE WORK DOCUMENT

Venue Site Survey Checklist — Excel Template

Check the equipment route from the loading bay to its final position. Record items that cannot pass and work awaiting approval, with photographs, drawings and replies.

WHAT THIS TEMPLATE HELPS YOU PREPARE

A survey record to send with dispatch and packing requests and discuss with the venue.

File formats
English XLSX · CSV (UTF-8)
Version
2.0
Editorial review
24 Oct 2026
Use this for
Compare clear openings, packed equipment dimensions, booked access times, floor protection and technical approval boundaries.

When to use it

Compare clear openings, packed equipment dimensions, booked access times, floor protection and technical approval boundaries.

All example dimensions and times are fictional. Electrical, structural and evacuation suitability requires the responsible specialist’s documentation; this sheet is not approval.

Start with the guide: Venue Survey and Load-in

Fill in the template step by step

When to use it

Complete during the survey before requesting the first quote, and repeat when the venue or equipment changes.

What to have ready

  • Venue equipment-access rules
  • Current event layout
  • Each supplier’s packed dimensions and trolley list
  • Numbered survey photographs
  1. Walk from vehicle arrival through unloading, doors and lifts to the final position. Give each section an ID.

  2. Compare measured openings and packed equipment in the same units. Record photo references where they do not fit.

  3. Name the supplier proposing an alternative and the venue officer approving it. Give each a reply deadline.

  4. Attach the approved condition sheet to dispatch and quote requests. Confirm receipt of that revision.

Worked example

Fictional example, not an actual event or supplier record

Eight columns · scroll horizontally to view the complete worked example.

Venue Site Survey Checklist — Excel Template — fictional worked example
Item IDRoute section or equipmentWhat needs checking?Measurements, findings and evidenceConfirmed or on holdPerson to confirmReply dueDocuments revised and people informed
S-01Loading bay D2 → access door BCheck whether the packed trolley, 1,120mm wide, can pass through the doorDoor measured 1,240mm at 10:10 on 2026-11-05 / photo P01 / drawing A03-v2ConfirmedLogistics lead Kim; venue access coordinator2026-11-05 16:00Issued Conditions v1.0 at 11:00 and checked it against the video supplier trolley list
S-02Freight lift → foyerCompare the packed video case height with the clear lift openingAt 10:25 on 2026-11-05, the case measured 2,180mm and the opening 2,100mm. The packed case cannot pass / P04Dimensions do not fit; load-in on holdVideo crew chief Park; logistics lead2026-11-05 15:00Requested a split-pack proposal and excluded this case from dispatch instructions
S-03Stage-side electrical handoverConfirm the venue connection point and supplier distribution workVenue reply E07-v1 confirms the connection point. Supplier distribution plan review is booked for 2026-11-06 09:00Order on hold pending technical reviewVenue electrical lead; audio technical director2026-11-06 10:00Marked connection approval as pending on v1.1. Send the technical reply to purchasing when received

Blank template preview

This preview shows a few rows. The downloaded file contains 24 prepared rows.

Eight columns · scroll horizontally to view the complete blank worksheet.

Venue Site Survey Checklist — Excel Template — blank worksheet
Item IDRoute section or equipmentWhat needs checking?Measurements, findings and evidenceConfirmed or on holdPerson to confirmReply dueDocuments revised and people informed
————————
————————
————————

Check your completed template

  • Every route section has been checked.
  • Each mismatch has an alternative, responsible person and deadline.
  • Approved work is clearly separated from work on hold.

What to pass to the next person

The logistics lead sends the common condition sheet, photographs and drawings to purchasing and every supplier.

Check before using this template

Matching dimensions alone do not establish that turns, gradients or floor loads are suitable.

Sources used to develop this template

EVENTODIT created this template using the working methods described in the public sources below. It is not an official form and has not been reviewed or approved by those organisations.