EVENTODIT.
EDITABLE WORK DOCUMENT

Attendance measures, scale scenarios and venue conditions

Separate registrations, entry and occupancy definitions and evidence, then record space and staffing conditions for each scenario.

WHAT THIS TEMPLATE HELPS YOU PREPARE

A scale review that distinguishes demand assumptions from actual layout restrictions

File formats
English XLSX · CSV (UTF-8)
Version
2.0
Editorial review
31 Oct 2026
Use this for
Use before confirming recruitment scale and after changes to space, sessions or layout.

When to use it

Use before confirming recruitment scale and after changes to space, sessions or layout.

Do not treat a general venue figure as approval for an event layout. A higher-demand forecast is not permission to increase capacity.

Start with the guide: Separate attendance forecasts from venue conditions when planning event scale

Fill in the template step by step

When to use it

When forecasting recruitment and space, and before changing scale or layout.

What to have ready

  • Registration trends and earlier event populations and periods
  • Current layout and venue’s actual applicable conditions
  • Operations, safety and accessibility resource evidence
  1. Define inclusion, period and duplicate treatment for each measure first.

  2. Use the same definitions across baseline, lower and higher scenarios and link evidence and assumptions.

  3. Distinguish general venue information from actual layout restrictions and obtain responsible-party confirmation.

  4. Send resource gaps and alternatives to the decision-maker; do not present a pending increase as approved.

Worked example

Fictional example, not an actual event or supplier record

Eight columns · scroll horizontally to view the complete worked example.

Attendance measures, scale scenarios and venue conditions — fictional worked example
Scenario and area IDMeasure, included people and periodForecast peopleEvidence, counting/deduplication and assumptionsLayout version and applicable restrictionStaff, access support and resource conditionsAdjustment trigger, authority and approvalUnconfirmed condition, owner and deadline
BASE-REG / AllRegistrations / general and invited, cancellations excluded / 11-18 17:00150Fictional forecast in R1 / unique registration IDs, deduplicatedDo not directly compare cumulative registration with simultaneous L1 capacityReview information and supply quantities by attendance routeP01 decides recruitment changes / V01 and S01 confirm venue conditionsR01 checks trend and population by 11-10 12:00
BASE-OCC / Hall H1Simultaneous occupancy / audience, speakers and staff / 11-20 14:00120Comparability with earlier event window unverified / assumption A1Fictional venue reply VR1: L1 limit 140 simultaneous people, with documented scope and conditionsEight operations staff available / accessible seating and route review underwayForecast of 120 is not safety approval / V01 and S01 reviewS01 checks flows and resources by 11-12 16:00
LOW-OCC / Hall H1Simultaneous occupancy / same scope as BASE-OCC90Lower scenario A2 / assumed pending demand evidenceReview L1 against venue reply VR1Staffing and session reductions unconfirmedP01 reviews evidence before reducing sessionsP02 returns revised quote and operating terms by 11-12 12:00
HIGH-OCC / Hall H1Simultaneous occupancy / same scope as BASE-OCC180Higher scenario A3 / registration and staggered-entry assumptions untestedExisting L1 limit 140 / no approval for expanded layout or another venueExtra staff, toilets and access support not securedHold increase / P01 reviews staggered sessions or another venue with V01 and S01Do not announce higher capacity before replies / P02 rechecks 11-13

Blank template preview

This preview shows a few rows. The downloaded file contains 24 prepared rows.

Eight columns · scroll horizontally to view the complete blank worksheet.

Attendance measures, scale scenarios and venue conditions — blank worksheet
Scenario and area IDMeasure, included people and periodForecast peopleEvidence, counting/deduplication and assumptionsLayout version and applicable restrictionStaff, access support and resource conditionsAdjustment trigger, authority and approvalUnconfirmed condition, owner and deadline
————————
————————
————————

Check your completed template

  • Registrations, entries and simultaneous occupancy are distinct.
  • Each forecast has evidence or an assumption/unconfirmed label.
  • Layout restrictions, resource checks, owners and decision deadlines are recorded.

What to pass to the next person

Planning sends consistent scenario definitions and layout versions to venue, operations and safety leads. Link the handover to the separate live area-observation log.

Check before using this template

The form does not calculate permitted capacity or approve safety automatically. Do not use it to delay protective action needed when danger arises.

Sources used to develop this template

EVENTODIT created this template using the working methods described in the public sources below. It is not an official form and has not been reviewed or approved by those organisations.