Permission, venue approval and change register

Track public procedures and venue approvals independently, including submission, receipt, corrections, conditions and changes.

WHAT THIS TEMPLATE HELPS YOU PREPARE

A procedure-by-procedure record of applicability, owners, deadlines and approval scope

File formats
English XLSX · CSV (UTF-8)
Version
2.0
Editorial review
31 Oct 2026
Use this for
Start when reviewing the site, activities and forecast audience; revisit after changes.

When to use it

Start when reviewing the site, activities and forecast audience; revisit after changes.

The register does not determine which permissions are legally required. Example deadlines are fictional; check real starting points and cutoffs with the authority or venue.

Start with the guide: Check event permits and venue approvals separately

Fill in the template step by step

When to use it

From the first authority and venue enquiries through change-approval verification.

What to have ready

  • Brief covering activities, site, people and setup/load-out
  • Written authority and venue procedures, documents and deadline rules
  • Submission copies, receipts, approval documents and changed layouts
  1. Give authority and venue procedures separate IDs and check applicability first.

  2. Record the actual submitter, document version, deadline starting point and evidence.

  3. Update each status from documents and actual times, distinguishing receipt from approval.

  4. Check the effect of changes on the existing scope and send the new confirmed conditions to the site team.

Worked example

Fictional example, not an actual event or supplier record

Eight columns · scroll horizontally to view the complete worked example.

Permission, venue approval and change register — fictional worked example
Procedure ID and authority or venueActivity and applicabilityEvidence, confirming person and timeSubmitter and document/layout versionDeadline, starting point, time zone and evidenceSubmission, receipt, correction and approval statusConditions, scope and site handoverChange impact, next owner and deadline
PA-01 / Local authority A01Outdoor programme / notification applicability under reviewBrief EV1 sent 11-03; A01 reply pendingSubmitter to confirm / draft layout L1 and schedule T1Unknown / check calculation and reception hoursQuestion sent 11-03 10:00 / not a completed filingScope unconfirmed / check before finalising work or recruitment termsP01 obtains applicability and document requirements by 11-05 15:00
PA-02 / Venue V01Hall work request / venue procedure confirmed VR1V01 reply VR1 at 11-03 14:00Tenant P01 / work plan W2 and layout L2Fictional VR1 deadline: 11-10 17:00 KST / not a universal legal deadlineSubmitted 11-06 11:00 / receipt REC2 / under reviewGate G2 and work hours being reviewed; receipt is not work approvalP02 checks V01 correction requests by 11-08 12:00
PA-03 / Venue V01Changed work drawing / reconfirmation neededAP2 covers L2 only / CH3 requested 11-09P02 / changed layout L3 and specialist evidence requestedChange-processing deadline unknown; hold work outside existing scopeExisting AP2 / no revised approval for L3Do not apply L2 approval to L3 / site lead R01 notified 11-09P02 checks change scope and deadlines with V01 and S01 by 11-10 12:00

Blank template preview

This preview shows a few rows. The downloaded file contains 24 prepared rows.

Eight columns · scroll horizontally to view the complete blank worksheet.

Permission, venue approval and change register — blank worksheet
Procedure ID and authority or venueActivity and applicabilityEvidence, confirming person and timeSubmitter and document/layout versionDeadline, starting point, time zone and evidenceSubmission, receipt, correction and approval statusConditions, scope and site handoverChange impact, next owner and deadline
————————
————————
————————

Check your completed template

  • Applicability and enquiry/submission owners are recorded for each procedure.
  • Receipt is distinct from approval and its conditions and scope.
  • Change checks, deadlines and site handover are traceable.

What to pass to the next person

The event lead sends approval documents, applicable drawings and conditions to site and construction leads. Hand unresolved procedures to named owners with deadlines.

Check before using this template

This is not an exhaustive list of legal requirements and does not replace filing or approval. Do not copy example deadlines or audience figures as general rules.